Physical Maintenance: |
|
|
 |
Anti-static raised flooring |
|
|
|
Fire-Suppression System: |
|
|
 |
FM200 (gas based) for collocation, electrical switch and UPS areas |
|
|
 |
Pre-action dry sprinkler system as secondary system |
|
|
 |
1 to 2 hr fire rated partition walls |
|
|
 |
Environmental monitoring / alarm system for DC support systems |
|
|
|
Air-Conditioning: |
|
|
 |
Multiple CRAC units with water leak detection system |
|
|
 |
Auto changeover control in all areas |
|
|
 |
Redundant chiller systems and chilled water pumps, with backup chilled water supply from the building |
|
|
|
Power Supply: |
|
|
 |
Dual power feed from building |
|
|
 |
Dual isolation transformers, surge arrestors and digital power meters |
|
|
 |
Redundant UPS system (approximately 15 mins backup time) |
|
|
 |
Dual bus topology all the way to the racks |
|
|
|
Generators: |
|
|
 |
Redundant generator sets with 700 liter day tank and automated sync panel supplying backup power |
|
|
|
Security and Support: |
|
|
 |
Premises are monitored 24 x 7 by CCTV with DVR and front and roving security |
|
|
 |
Entrances secured by VeriID fingerprint reader and HID proximity card reader |
|
|
 |
Mantrap in main entry and all doors are steel clad |
|